Tenders
Flood Simulator
Multimedia
Highway and Bridge Conditions
Reports, Articles & Backgrounders
Newsletter

Reports, Articles & Backgrounders

  1. May 5, 2010 – 2009 Groundwater Monitoring Activity Report (3.1 MB)

  2. May 5, 2010 – 2009 Construction Surface Water Monitoring (5.2 MB)

  3. Sturgeon Creek Riparian Area Planting Presentation (3.7 MB)
    • Exit Survey (14 kb)

      Please mail the Survey to:
      The Manitoba Floodway Authority
      200-155 Carlton Street
      Winnipeg, MB   R3C 3H8

  4. February 12, 2010 – Canadian Business Journal Article (February, 2010 (1.3 MB)

  5. June 17, 2009 – Bridge Replacement over the Red River Floodway and Related Roadworks on P.T.H. No. 15 Information Package (11.3 MB)

  6. April 1, 2009 – 2008 Groundwater Monitoring Activity Report (6.7 MB)

  7. April 1, 2009 – 2008 Construction Surface Water Monitoring (4.7 MB)

  8. February 17, 2009 – Presentation of the PTH 44 Highway Bridge Project (10.8 MB)

  9. October 14, 2008 – Presentation on Mitigation Options Related to Artificial Flooding (6MB) - Deadline for submission of public comments extended to Monday, November 3, 2008.

  10. October 7, 2008 – Final Report – Human Health Risk Assessment (17.9MB)

  11. June 26, 2008: Red River Floodway Off Limits to Off-Road Vehicles (99 kb)

  12. 2007 Groundwater Monitoring Activity Report (3.3MB)

  13. 2007 Construction Surface Water Monitoring (3.5MB)

  14. Snowmobile Safety Advertisment (131 kb)

  15. 2007 Annual Report (890 kb)

  16. 2006 Annual Report (1.2MB)

  17. 2006 Groundwater Monitoring Activity Report (3.3MB)

  18. 2006 Construction Surface Water Monitoring (3.8MB)

  19. International Joint Commission Report "Living with the Red"
    http://www.ijc.org/php/publications/html/living.html

  20. Report on the Status of Implementation of Observations and Advice of the Dam Safety Experts (7MB)

  21. Environmental Management Plan – Initial Draft (900kb)

  22. Groundwater Action Response Plan (Adobe PDF)

  23. Flood Simulation Project.

  24. Recreation & Economic Development Opportunities Report

  25. Manitoba Conservation Public Registry for the Red River Floodway Expansion Project

  26. Recreation and Economic Opportunities - Information Package

  27. Regulatory Approval - Public Consultation Process

  28. Winnipeg Free Press Op-Ed - Flood Protection in Manitoba: Charting a New Course

  29. Flood Protection for Winnipeg Part 1 and 2- Executive Summary & Table of Contents
    To view the full report, please contact the Manitoba Conservation and Environment Library, Suite 160 - 123 Main Street or call 945-7126.

  30. Flood Protection for Winnipeg Part 3 - Executive Summary & Table of Contents
    To view the full report, please contact the Manitoba Conservation and Environment Library, Suite 160 - 123 Main Street or call 945-7126.

  31. Flood Protection Studies for Winnipeg - Executive Summary & Table of Contents
    To view the full report, please contact the Manitoba Conservation and Environment Library, Suite 160 - 123 Main Street or call 945-7126.

  32. Re-Computation of Natural Water Levels at the Floodway Inlet

  33. A Review of the Red River Floodway Operating Rules

  34. Legislative Committee Hearings on the Red River Floodway Act

  35. Legislative Committee Hearings on the Floodway Authority Act

Back to top

Canada MB